UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
FORM 10-Q
[X] QUARTERLY REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
For the quarterly period ended March 31, 2011
OR
[ ] TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
For the transition period from ________to________
Commission file number: 001-32974
URANERZ ENERGY CORPORATION
(Exact name of registrant as specified in its charter)
NEVADA | 98-0365605 |
(State or other jurisdiction of incorporation or | (I.R.S. Employer Identification No.) |
organization) | |
1701 East E Street, PO Box 50850 | |
Casper, Wyoming | 82605-0850 |
(Address of principal executive offices) | (Zip Code) |
(307) 265-8900
(Registrants telephone
number, including area code)
_____________________________________________
(Former name,
former address and former fiscal year, if changed since last report)
Indicate by check mark whether the issuer (1) has filed all reports
required to be filed by Section 13 or 15(d) of the Securities Exchange Act of
1934 during the preceding 12 months (or for such shorter period that the registrant
was required to file such reports), and (2) has been subject to such filing
requirements for the past 90 days.
Yes [X] No [ ]
Indicate by check mark whether the registrant has submitted electronically
and posted on its corporate Web site, if any, every Interactive Data File required
to be submitted and posted pursuant to Rule 405 of Regulation S-T (§232.405
of this chapter) during the preceding 12 months (or for such shorter period
that the registrant was required to submit and post such files).
Yes [ ] No [ ]
Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, or a smaller reporting company. See the definitions of large accelerated filer, accelerated filer and smaller reporting company in Rule 12b-2 of the Exchange Act.
Large accelerated filer [ ] | Accelerated filer [X] |
Non-accelerated filer [ ] | Smaller reporting company [ ] |
Indicate by check mark whether the registrant is a shell company
(as defined in Rule 12b-2 of the Exchange Act)
Yes [ ] No [X]
Number of shares of issuers common stock outstanding at May 2, 2011: 76,404,074
INDEX
Item 2. | Unregistered Sales of Equity Securities and Use of Proceeds | |
Item 3. | Defaults Upon Senior Securities | |
Item 4. | (RESERVED & REMOVED) | |
Item 5. | Other Information | |
Item 6. | Exhibits | |
SIGNATURES |
Item 1. Financial Statements
Uranerz Energy Corporation |
(An Exploration Stage Company) |
March 31, 2011 |
Uranerz Energy Corporation |
(An Exploration Stage Company) |
Consolidated Balance Sheets |
(Expressed in US dollars) |
March 31, | December 31, | |||||
2011 | 2010 | |||||
$ | $ | |||||
(Unaudited) | (Audited) | |||||
ASSETS | ||||||
Current Assets | ||||||
Cash | 47,369,035 | 36,437,370 | ||||
Prepaid expenses and deposits (Note 6(a)) | 707,028 | 816,269 | ||||
Other current assets | 56,206 | 32,011 | ||||
Total Current Assets | 48,132,269 | 37,285,650 | ||||
Prepaid Expenses and Deposits (Note 6(a)) | 1,416,729 | 825,583 | ||||
Mineral Property Reclamation Surety Deposits (Note 12(f)) | 2,019,721 | 2,019,721 | ||||
Property and Equipment (Note 4) | 853,310 | 503,129 | ||||
Total Assets | 52,422,029 | 40,634,083 | ||||
LIABILITIES AND STOCKHOLDERS EQUITY | ||||||
Current Liabilities | ||||||
Accounts payable | 655,061 | 93,115 | ||||
Accrued liabilities (Note 6(b)) | 470,783 | 617,184 | ||||
Due to related parties (Note 7) | 399,316 | 49,186 | ||||
Total Liabilities | 1,525,160 | 759,485 | ||||
Commitments and Contingencies (Notes 5 and 12) | ||||||
Subsequent Event (Note 14) | ||||||
Stockholders Equity | ||||||
Preferred Stock, 10,000,000 shares authorized, $0.001 par value;
No shares issued and outstanding |
|
|
||||
Common Stock, 200,000,000 shares authorized,
$0.001 par value; 76,324,074 and 70,821,433 shares issued and outstanding, respectively |
76,324 |
70,821 |
||||
Additional Paid-in Capital | 139,416,435 | 123,138,957 | ||||
Deficit Accumulated During the Exploration Stage | (88,625,806 | ) | (83,443,134 | ) | ||
Total Stockholders Equity | 50,866,953 | 39,766,644 | ||||
Non-controlling Interest | 29,916 | 107,954 | ||||
Total Equity | 50,896,869 | 39,874,598 | ||||
Total Liabilities and Stockholders Equity | 52,422,029 | 40,634,083 |
(The accompanying notes are an integral part of these unaudited consolidated financial statements)
F-1
Uranerz Energy Corporation |
(An Exploration Stage Company) |
Consolidated Statements of Operations |
(Expressed in US dollars) |
(Unaudited) |
Accumulated From | |||||||||
May 26, 1999 | |||||||||
(Date of Inception) | Three Months Ended | ||||||||
to March 31, | March 31, | ||||||||
2011 | 2011 | 2010 | |||||||
$ | $ | $ | |||||||
Revenue | | | | ||||||
Expenses | |||||||||
Depreciation | 632,403 | 54,718 | 46,371 | ||||||
Foreign exchange | 48,968 | 16,083 | 1,828 | ||||||
General and administrative (Note 9) | 42,493,120 | 4,996,565 | 4,549,002 | ||||||
Mineral property expenditures | 50,906,665 | 289,738 | 1,186,541 | ||||||
Total Operating Expenses | 94,081,156 | 5,357,104 | 5,783,742 | ||||||
Operating Loss | (94,081,156 | ) | (5,357,104 | ) | (5,783,742 | ) | |||
Other Income (Expense) | |||||||||
Gain on sale of investment securities | 79,129 | | | ||||||
Interest income | 2,036,153 | 96,394 | 15,506 | ||||||
Loss on settlement of debt | (132,000 | ) | | | |||||
Mineral property option payments received | 152,477 | | | ||||||
Total Other Income | 2,135,759 | 96,394 | 15,506 | ||||||
Loss from continuing operations | (91,945,397 | ) | (5,260,710 | ) | (5,768,236 | ) | |||
Discontinued operations | |||||||||
Loss from discontinued operations | (28,732 | ) | | | |||||
Gain on disposal of discontinued operations | 979,709 | | | ||||||
Gain on Discontinued Operations | 950,977 | | | ||||||
Net Loss | (90,994,420 | ) | (5,260,710 | ) | (5,768,236 | ) | |||
Net loss attributable to non-controlling interest | 2,368,614 | 78,038 | 73,441 | ||||||
Net Loss Attributable to the Company | (88,625,806 | ) | (5,182,672 | ) | (5,694,795 | ) | |||
Amounts attributable to Company shareholders | |||||||||
Loss from continuing operations | (89,576,783 | ) | (5,182,672 | ) | (5,694,795 | ) | |||
Gain on discontinued operations | 950,977 | | | ||||||
Net Loss Attributable to the Company | (88,625,806 | ) | (5,182,672 | ) | (5,694,795 | ) | |||
Net Loss Per Share Basic and Diluted | (0.07 | ) | (0.09 | ) | |||||
Weighted Average Shares Outstanding | 73,339,000 | 64,195,000 |
(The accompanying notes are an integral part of these unaudited consolidated financial statements)
F-2
Uranerz Energy Corporation |
(An Exploration Stage Company) |
Consolidated Statements of Cash Flows |
(Expressed in US dollars) |
(Unaudited) |
Accumulated From | |||||||||
May 26, 1999 | |||||||||
(Date of Inception) | Three Months Ended | ||||||||
to March 31, | March 31, | ||||||||
2011 | 2011 | 2010 | |||||||
$ | $ | $ | |||||||
Operating Activities | |||||||||
Net loss | (90,994,420 | ) | (5,260,710 | ) | (5,768,236 | ) | |||
Adjustments to reconcile net loss to cash used in operating activities: | |||||||||
Depreciation | 632,403 | 54,718 | 46,371 | ||||||
Equity loss on investment | 74,617 | | | ||||||
Gain on disposition of discontinued operations | (979,709 | ) | | | |||||
Gain on sale of investment securities | (79,129 | ) | | | |||||
Loss on settlement of debt | 132,000 | | | ||||||
Non-cash mineral property option payment | (37,500 | ) | | | |||||
Shares issued to acquire mineral properties | 19,105,000 | | | ||||||
Warrants issued for mineral property costs | 1,258,000 | | | ||||||
Stock-based compensation | 23,219,916 | 2,854,578 | 3,398,736 | ||||||
Changes in operating assets and liabilities: | |||||||||
Prepaid expenses and deposits | (2,117,520 | ) | (481,905 | ) | (86,964 | ) | |||
Other current assets | (56,181 | ) | (24,195 | ) | 1,464 | ||||
Accounts payable and accrued liabilities | 1,256,511 | 415,544 | (171,262 | ) | |||||
Due to related parties | 870,076 | 350,131 | (19,022 | ) | |||||
Net Cash Used in Operating Activities | (47,715,936 | ) | (2,091,839 | ) | (2,598,913 | ) | |||
Investing Activities | |||||||||
Reclamation surety deposits | (2,019,721 | ) | | | |||||
Acquisition of subsidiary, net cash paid | (48 | ) | | | |||||
Proceeds from sale of marketable securities | 20,548,664 | | | ||||||
Purchase of property and equipment | (1,387,297 | ) | (404,899 | ) | (52,666 | ) | |||
Equipment deposits | | | |||||||
Purchase of investment securities | (20,432,035 | ) | | (2,214 | ) | ||||
Disposition of subsidiary | 905,092 | | | ||||||
Net Cash Used In Investing Activities | (2,385,345 | ) | (404,899 | ) | (54,880 | ) | |||
Financing Activities | |||||||||
Repayment of loan payable | (98,414 | ) | | (8,950 | ) | ||||
Advances from related party | 10,700 | | | ||||||
Contributions from non-controlling interest | 2,398,530 | | 38,000 | ||||||
Proceeds from issuance of common stock | 99,666,638 | 13,453,046 | | ||||||
Share issuance costs | (4,507,138 | ) | (24,643 | ) | | ||||
Net Cash Provided By Financing Activities | 97,470,316 | 13,428,403 | 29,050 | ||||||
Increase (Decrease) In Cash | 47,369,035 | 10,931,665 | (2,624,743 | ) | |||||
Cash - Beginning of Period | | 36,437,370 | 20,426,032 | ||||||
Cash - End of Period | 47,369,035 | 47,369,035 | 17,801,289 | ||||||
Non-cash Investing and Financing Activities | |||||||||
Sale of 60% of subsidiary for interest in mineral property | 774,216 | | | ||||||
Investment securities received as a mineral property option payment | 37,500 | | | ||||||
Purchase of equipment with loan payable | 98,414 | | | ||||||
Common stock issued to settle debt | 744,080 | | | ||||||
Warrants issued for mineral property costs | 1,258,000 | ||||||||
Common stock issued for mineral property costs | 19,105,000 | | | ||||||
Supplemental Disclosures | |||||||||
Interest paid | 12,184 | | 302 | ||||||
Income taxes paid | | | |
(The accompanying notes are an integral part of these unaudited consolidated financial statements)
F-3
Uranerz Energy Corporation |
(An Exploration Stage Company) |
Consolidated Statement of Stockholders Equity |
For the Three-Month Period Ended March 31, 2011 |
(Expressed in US dollars) |
(Unaudited) |
Deficit | ||||||||||||||||||
Accumulated | ||||||||||||||||||
Additional | During the | |||||||||||||||||
Common Stock | Paid-in | Exploration | Non-Controlling | |||||||||||||||
Shares | Amount | Capital | Stage | Interest | Total | |||||||||||||
# | $ | $ | $ | $ | $ | |||||||||||||
Balance, December 31, 2010 | 70,821,433 | 70,821 | 123,138,957 | (83,443,134 | ) | 107,954 | 39,874,598 | |||||||||||
Fair value of stock options granted | | | 2,854,578 | | | 2,854,578 | ||||||||||||
Shares issued upon the exercise of options | 1,461,220 | 1,461 | 1,327,322 | | | 1,328,783 | ||||||||||||
Shares issued upon the exercise of warrants | 4,041,421 | 4,042 | 12,120,221 | | | 12,124,263 | ||||||||||||
Share issuance costs | | | (24,643 | ) | | | (24,643 | ) | ||||||||||
Net loss and comprehensive loss for the period | | | | (5,182,672 | ) | (78,038 | ) | (5,260,710 | ) | |||||||||
Balance, March 31, 2011 | 76,324,074 | 76,324 | 139,416,435 | (88,625,806 | ) | 29,916 | 50,896,869 |
(The accompanying notes are an integral part of these unaudited consolidated financial statements)
F-4
Uranerz Energy Corporation |
(An Exploration Stage Company) |
Notes to the Consolidated Financial Statements |
March 31, 2011 |
(Expressed in US dollars) |
(Unaudited) |
1. | Nature of Operations |
Uranerz Energy Corporation (the Company) was incorporated in the State of Nevada, U.S.A. on May 26, 1999. Effective July 5, 2005, the Company changed its name from Carleton Ventures Corp. to Uranerz Energy Corporation. The Company has mineral property interests in Canada and the United States. |
|
The Company is an Exploration Stage Company, as defined by Financial Accounting Standards Board (FASB) Accounting Standards Codification (ASC) 915, Development Stage Entities. The Companys principal business is the acquisition and exploitation of uranium and mineral resources. |
2. | Summary of Significant Accounting Policies |
|
a) | Basis of Presentation |
|
The interim unaudited consolidated financial statements have been prepared in accordance with accounting principles generally accepted in the United States for interim financial information and with the Securities and Exchange Commission (SEC) instructions for companies filing Form 10-Q. In the opinion of management, the unaudited financial statements have been prepared on the same basis as the annual financial statements and reflect all adjustments, which include only normal recurring adjustments, necessary to present fairly the financial position as of March 31, 2011, and the results of operations and cash flows for the period then ended. The financial data and other information disclosed in the notes to the interim consolidated financial statements related to this period are unaudited. The results for the three-month period ended March 31, 2011 are not necessarily indicative of the results to be expected for any subsequent quarter or the entire year ending December 31, 2011. The unaudited interim consolidated financial statements have been condensed pursuant to the Securities and Exchange Commission's rules and regulations and do not include all of the information and footnotes required by generally accepted accounting principles for complete financial statements. Therefore, these consolidated financial statements should be read in conjunction with the Companys annual audited consolidated financial statements and notes thereto for the year ended December 31, 2010, included in the Companys Annual Report on Form 10- K filed on March 15, 2011 with the SEC. |
||
b) | Cash and Cash Equivalents |
|
The Company considers all highly liquid instruments with a maturity of three months or less at the time of issuance to be cash equivalents. |
||
c) | Mineral Property Costs |
|
The Company is primarily engaged in the acquisition, exploration and development of mineral properties. Mineral property acquisition costs are capitalized when management has determined that probable future benefits consisting of a contribution to future cash inflows have been identified and adequate financial resources are available or are expected to be available as required to meet the terms of property acquisitions and budgeted exploration and development expenditures. Mineral property acquisition costs are expensed as incurred if the criteria for capitalization are not met. In the event that a mineral property is acquired through the issuance of the Companys shares, the mineral property will be recorded at the fair value of the respective property or the fair value of common shares, whichever is more readily determinable. |
||
When mineral properties are acquired under option agreements with future acquisition payments to be made at the sole discretion of the Company, those future payments, whether in cash or shares, are recorded only when the Company has made or is obliged to make the payment or issue the shares. When it has been determined that a mineral property can be economically developed as a result of establishing proven and probable reserves and a bankable feasibility, the costs incurred to develop such property are capitalized. |
||
d) | Income Taxes |
|
Potential benefits of income tax losses are not recognized in the accounts until realization is more likely than not. The Company has adopted ASC 740, Income Taxes as of its inception. Pursuant to ASC 740 the Company is required to compute tax asset benefits for net operating losses carried forward. The potential benefits of net operating losses have not been recognized in these consolidated financial statements because the Company cannot be assured it is more likely than not it will utilize the net operating losses carried forward in future years. |
F-5
Uranerz Energy Corporation |
(An Exploration Stage Company) |
Notes to the Consolidated Financial Statements |
March 31, 2011 |
(Expressed in US dollars) |
(Unaudited) |
2. | Summary of Significant Accounting Policies (continued) |
|
e) | Fair Value of Financial Instruments |
|
Financial instruments consist principally of cash and cash equivalents and accounts payable. Pursuant to ASC 820, Fair Value Measurements and Disclosures and ASC 825, Financial Instruments the fair value of cash equivalents and marketable securities is determined based on Level 1 inputs, which consist of quoted prices in active markets for identical assets. The recorded values of all other financial instruments approximate their current fair values because of their nature and respective relatively short maturity dates or durations. |
||
f) | Recent Accounting Pronouncements |
|
The Company has implemented all new accounting pronouncements that are in effect and that may impact its financial statements and does not believe that there are any other new accounting pronouncements that have been issued that might have a material impact on its financial position or results of operations. |
||
3. | Cash, Cash Equivalents and Marketable Securities |
|
At March 31, 2011, the Company had $47,369,035 in cash and cash equivalents. Pursuant to ASC 820 the fair value of cash equivalents is determined based on Level 1 inputs, which consist of quoted prices in active markets for identical assets. The Company places cash investments in instruments that meet credit quality standards, as specified in the investment policy guidelines. |
||
4. | Property and Equipment |
March 31, | December 31, | ||||||||||||
2011 | 2010 | ||||||||||||
Accumulated | Net Carrying | Net Carrying | |||||||||||
Cost | Depreciation | Value | Value | ||||||||||
$ | $ | $ | $ | ||||||||||
Computers and office equipment | 221,790 | 143,907 | 77,883 | 85,936 | |||||||||
Field equipment | 1,033,997 | 488,495 | 545,502 | 417,193 | |||||||||
Construction in progress | 229,925 | | 229,925 | | |||||||||
1,485,712 | 632,402 | 853,310 | 503,129 |
5. | Mineral Properties |
|
a) | On April 26, 2005, the Company entered into an agreement to acquire a 100% interest in two mineral prospecting permits located in the Athabasca Basin area of Saskatchewan, Canada for consideration of Cdn$40,757 and a 2% royalty on the prospecting permits. On November 4, 2005, the Company entered into an option and joint venture agreement with a company (the Optionee) on the Companys two mineral prospecting permits. In 2007, a total of seven claims were staked within the boundaries of the original two mineral prospecting permits. On April 24, 2008, the Optionee forfeited its right to earn an interest in the property. The Company allowed the seven claims to expire in January, 2011. As at March 31, 2011, the Company had received Cdn$50,000 of installment payments pursuant to this agreement, which were netted against mineral property expenditures. |
|
b) | On November 18, 2005, the Company entered into an agreement to acquire a 100% interest in 10 mining claims located in the Powder River Basin area, Wyoming, in consideration of $250,000. The amounts were paid in installments and completed by January 2007. |
|
c) | On December 9, 2005, the Company entered into an option agreement to acquire a 100% interest in 44 mining claims within six mineral properties located in the Powder River Basin area, Wyoming. As at December 31, 2007 all requirements of this option agreement were satisfied and a deed for the 44 claims was received. A royalty fee of between 6% - 8% is payable, based on the uranium spot price at the time of delivery. |
F-6
Uranerz Energy Corporation |
(An Exploration Stage Company) |
Notes to the Consolidated Financial Statements |
March 31, 2011 |
(Expressed in US dollars) |
(Unaudited) |
5. | Mineral Properties (continued) |
|
d) | On June 7, 2006, the Company entered into an Agreement with a company (the Optionee) on two of the Companys exploration projects located within the Red Desert area of southwest Wyoming. Under the Agreement the Company and the Optionee are to form a joint venture to conduct further exploration and to develop the properties. The Optionee had the right to earn a 50% equity interest in the joint venture during the first phase of the exploration program by managing the property, incurring a minimum $100,000 per year of exploration costs on the projects, and incurring $750,000 of exploration costs, within three years of inception of the agreement. On August 18, 2009 the Optionee terminated the Agreement and relinquished all right, title and interest in the lode mining claims and state leases that are part of the Agreement. |
|
e) | On February 1, 2007, the Company acquired three mineral properties consisting of 138 unpatented lode mining claims located in Campbell County, Wyoming for a total purchase price of $3,120,000. |
|
f) | In 2007, the Company acquired several mining leases in Briscoe County, Texas for a total purchase price of $60,817. |
|
g) | On January 15, 2008, the Company acquired an undivided eighty-one percent (81%) interest in approximately 82,000 acres (33,100 hectares) of mineral properties located in the central Powder River Basin of Wyoming, and entered into a venture agreement (the Arkose Mining Venture) with the vendor pursuant to which the Company will explore the properties. In accordance with the terms of the September 19, 2007 Purchase Agreement, the Company paid $5,757,043 cash and issued 5,750,000 shares of the Companys common stock at a fair value of $19,090,000 to acquire the 81% interest. At January 15, 2008, the acquisition cost of $24,847,043 was allotted as follows: |
Prepaid expenses | $ | 229,247 | ||
Mineral property expenditures | 24,617,796 | |||
$ | 24,847,043 |
h) | On August 20, 2008, the Company leased 891 acres of mineral properties near the Companys Nichols Ranch project area in Wyoming for an advance royalty payment of $22,275. |
|
i) | On August 20, 2008, the Company, on behalf of the Arkose Mining Venture, leased 6,073 acres of mineral properties within Arkoses area of interest in Wyoming for an advance royalty payment of $151,828. |
|
j) | On September 18, 2008, the Company leased 984 acres of mineral properties within the Companys North Reno Creek project area in Wyoming. |
|
k) | On December 3, 2008, the Company, on behalf of the Arkose Mining Venture, leased 1,680 acres of mineral properties within Arkoses area of interest in Wyoming for a five year advance royalty payment of $83,993. |
|
l) | On July 7, 2009, the Company, on behalf of the Arkose Mining Venture, leased 320 acres of mineral properties within Arkoses area of interest in Wyoming. |
|
m) | On August 21, 2009, the Company decided not to pay annual maintenance fees totaling $58,380 for 285 100% - owned mining claims and 132 mining claims with an 81% interest that are no longer of strategic interest to the Company. |
|
n) | On January 26, 2010, the Company acquired Geological Data on the North Reno Creek uranium prospect located in Campbell County, Wyoming for a total purchase price of $600,000. |
|
o) | On July 2, 2010 the Company paid the remaining $606,780 of a $674,200 customer advance for the provision of electricity to the Companys Nichols Ranch Uranium In-Situ Recovery Project. |
|
p) | On July 29, 2010 the Company decided not to renew 295 mineral claims owned 100% by the Company and 1,266 mineral claims owned by the Arkose Mining Venture. |
|
q) | On August 13, 2010, the Company acquired Geological Data on Powder River Basin, Wyoming by issuing warrants with a fair value of $1,258,000 to purchase 2,000,000 common shares of the Company at an exercise price of $3.00 per share. |
F-7
Uranerz Energy Corporation |
(An Exploration Stage Company) |
Notes to the Consolidated Financial Statements |
March 31, 2011 |
(Expressed in US dollars) |
(Unaudited) |
6. | Balance Sheet Details |
|
a) | The components of prepaid expenses and deposits are as follows: |
March 31, | December 31, | ||||||
2011 | 2010 | ||||||
$ | $ | ||||||
Consulting | | 5,295 | |||||
Insurance | 93,329 | 66,905 | |||||
Lease costs | 257,200 | 405,012 | |||||
Reclamation bonding | 188,695 | 224,655 | |||||
Surface use and damage costs | 72,735 | 109,806 | |||||
Other | 95,069 | 4,596 | |||||
Current prepaid expenses and deposits | 707,028 | 816,269 | |||||
Construction equipment advance | 590,946 | | |||||
Deposits | 29,433 | 29,233 | |||||
Power supply advance | 674,200 | 674,200 | |||||
Power supply deposit | 122,150 | 122,150 | |||||
Non-current prepaid expenses and deposits | 1,416,729 | 825,583 |
b) | The components of accrued liabilities are as follows: |
March 31, | December 31, | ||||||
2011 | 2010 | ||||||
$ | $ | ||||||
Mineral exploration expenses | 279,236 | 457,100 | |||||
Reclamation costs | 75,650 | 78,084 | |||||
Other | 115,897 | 82,000 | |||||
Total accrued liabilities | 470,783 | 617,184 |
7. | Related Party Transactions / Balances |
|
a) | During the three months ended March 31, 2011, the Company incurred $Nil (2010 - $49,300) for contracted office and administrative services (included in general and administrative expenses) to a company controlled by a director who is Executive Chairman of the Company. |
|
b) | During the three months ended March 31, 2011, the Company incurred $261,915 (2010 - $215,538) for consulting services (included in general and administrative expenses) provided by Officers. Other general and administrative expenses were reimbursed in the normal course of business. At March 31, 2011, consulting services and expenditures incurred on behalf of the Company of $64,983 (December 31, 2010 - $46,493) are owed to these Officers, and these amounts are unsecured, non-interest bearing, and due on demand. |
|
c) | During the three months ended March 31, 2011, the Company paid fees of $40,375 (2010 - $37,875) to five non-executive directors of the Company for their services as directors. Other general and administrative expenses were reimbursed to the directors in the normal course of business. At March 31, 2011, expenditures incurred on behalf of the Company of $12,340 (December 31, 2010 - $2,693) are owed to these directors, and these amounts are unsecured, non-interest bearing, and due on demand. |
|
d) | During the three months ended March 31, 2011, the Company incurred $671,993 (2010 - $Nil) for bonuses (included in general and administrative expenses) for related party officers. At March 31, 2011, bonuses of $321,993 (December 31, 2010 - $Nil) are owed to these officers, and these amounts are unsecured, non- interest bearing, and due on demand. |
F-8
Uranerz Energy Corporation |
(An Exploration Stage Company) |
Notes to the Consolidated Financial Statements |
March 31, 2011 |
(Expressed in US dollars) |
(Unaudited) |
8. | Common Stock |
|
a) | During the three months ended March 31, 2011, the Company issued 1,461,220 shares of common stock, pursuant to the exercise of stock options, for proceeds of $1,328,783. |
|
b) | During the three months ended March 31, 2011, the Company issued 4,041,421 shares of common stock, pursuant to the exercise of common share purchase warrants, for gross proceeds of $12,124,263. |
|
9. | Stock Based Compensation |
|
The Company adopted a Stock Option Plan dated November 7, 2005 under which the Company is authorized to grant stock options to acquire up to a total of 10,000,000 shares of common stock. No options shall be issued under the Stock Option Plan at a price per share less than the defined Market Price. On June 11, 2008, the Company modified the Stock Option Plan to define Market Price as the volume weighted average trading price of the Companys common shares on the Toronto Stock Exchange or American Stock Exchange, now the NYSE Amex, whichever has the greater trading volume for the five trading days before the date of grant. At March 31, 2011, the Company had 884,860 shares of common stock available to be issued under the Plan. |
||
On January 10, 2011, the Company granted 1,045,000 stock options with immediate vesting to directors, officers, employees and consultants to acquire 1,045,000 common shares at an exercise price of $3.98 per share expiring in 5 10 years. During the three months ended March 31, 2011, the Company recorded stock- based compensation for the vested options of $2,854,578, as general and administrative expense related to these options. |
||
During the three months ended March 31, 2010, the Company granted 987,500 stock options to directors, officers, employees and consultants to acquire 702,500 common shares at an exercise price of $1.33 per share for 5 - 10 years, 185,000 common shares at an exercise price of $1.35 per share for 1.5 years and 100,000 common shares at an exercise price of $1.40 per share for 10 years. During the three months ended March 31, 2010, the Company recorded stock-based compensation for the vested options of $862,928, as general and administrative expense. |
||
On March 3, 2010, the Company modified the terms of 5,286,700 outstanding options. The weighted average grant date fair value of the modified stock options was $0.49 and the Company recognized an additional $2,535,808 in stock based compensation expense which is included in general and administrative. |
||
The fair values of stock options granted were estimated at the date of grant using the Black-Scholes option- pricing model and the weighted average grant date fair values of stock options granted during the three months ended March 31, 2011 and 2010 were $2.72 and $0.92 per share, respectively. |
||
The weighted average assumptions used are as follows: |
Three Months Ended | |||||||
March 31, | March 31, | ||||||
2011 | 2010 | ||||||
Expected dividend yield | 0% | 0% | |||||
Risk-free interest rate | 1.48% | 1.81% | |||||
Expected volatility | 98% | 108% | |||||
Expected option life (in years) | 4.05 | 3.69 |
The total intrinsic value of stock options exercised during the three months ended March 31, 2011 and 2010, was $5,612,700 and $nil respectively.
F-9
Uranerz Energy Corporation |
(An Exploration Stage Company) |
Notes to the Consolidated Financial Statements |
March 31, 2011 |
(Expressed in US dollars) |
(Unaudited) |
9. | Stock Based Compensation (continued) |
The following table summarizes the continuity of the Companys stock options: |
Weighted- | |||||||||||||
Weighted | Average | ||||||||||||
Average | Remaining | Aggregate | |||||||||||
Number of | Exercise | Contractual | Intrinsic | ||||||||||
Options | Price | Term (years) | Value | ||||||||||
$ | $ | ||||||||||||
Outstanding, December 31, 2010 | 6,735,600 | 1.86 | 6.05 | 14,372,749 | |||||||||
Granted | 1,045,000 | 3.98 | |||||||||||
Exercised | (1,461,220 | ) | 0.91 | ||||||||||
Expired | (40,000 | ) | 0.65 | ||||||||||
Outstanding, March 31, 2011 | 6,279,380 | 2.44 | 6.47 | 5,668,260 | |||||||||
Exercisable, March 31, 2011 | 6,254,380 | 2.45 | 6.46 | 5,623,510 |
A summary of the status of the Companys non-vested options at March 31, 2011, and changes during the three months ended March 31, 2011 are presented below:
Weighted | |||||||
Average | |||||||
Number of | Grant Date | ||||||
Options | Fair Value | ||||||
$ | |||||||
Non-vested at December 31, 2010 | 75,000 | 1.16 | |||||
Granted | 1,045,000 | 2.72 | |||||
Vested | (1,095,000 | ) | 2.65 | ||||
Non-vested at March 31, 2011 | 25,000 | 0.98 |
As at March 31, 2011, there was $17,546 in total unrecognized compensation cost related to non-vested stock option agreements. This cost is expected to be recognized over a weighted average period of 0.36 years.
10. | Stock Purchase Warrants |
During February 2011, 4,041,421 common share purchase warrants were exercised for gross proceeds of $12,124,263 and 183,579 common share purchase warrants expired, unexercised. |
|
A summary of the changes in the Companys common share purchase warrants is presented below: |
Weighted Average | |||||||
Number | Exercise Price | ||||||
$ | |||||||
Balance December 31, 2010 | 6,225,000 | 3.00 | |||||
Exercised | (4,041,421 | ) | 3.00 | ||||
Expired | (183,579 | ) | 3.00 | ||||
Balance March 31, 2011 | 2,000,000 | 3.00 |
As at March 31, 2011, the following common share purchase warrants were outstanding:
Number of Warrants | Exercise Price | Expiry Date |
$ | ||
2,000,000 | 3.00 | June 30, 2014 |
F-10
Uranerz Energy Corporation |
(An Exploration Stage Company) |
Notes to the Consolidated Financial Statements |
March 31, 2011 |
(Expressed in US dollars) |
(Unaudited) |
11. | Shareholder Rights Plan |
|
The Company has adopted a Shareholder Rights Plan (the "Plan") effective August 25, 2010. The Plan confers one right (a "Right") for each of the Companys outstanding shares of common stock, as at August 25, 2010 and for shares of common stock issued thereafter. Each Right will be evidenced by the Company's shares of common stock and will trade with the Company's shares of common stock. Under the terms of the Plan, the Rights separate and become exercisable upon a flip-in event: if a person or group acquires 20% or more of the Company's common stock other than through a take-over bid which meets certain requirements, among them that the offer be extended to all shareholders, that it remain open for 60 days, and that it receive approval of not less than 50% of independent shareholders. If a flip-in event occurs as described in the Plan, the Rights entitle the holder of each Right to purchase for $8.75 per share (the exercise price) that number of shares of common stock of the Company which has a market value of twice the exercise price, subject to certain adjustments as provided under the Plan. The Plan is effective for a three-year period. |
||
12. | Commitments |
|
a) | The Company has employment or consulting services agreements with each of its executives. Officers with contracts for services have notice requirements which permit pay in lieu of notice and all officers are due a termination payment following a change in control of the Company. |
|
b) | On September 18, 2008, the Company signed two mining lease agreements which require ten annual payments of $75,000. The first three payments have been made. Refer to Note 5(j). |
|
c) | In 2008 the Company provided a bond in the amount of $622,500 to the State of Wyoming, Department of Environmental Quality or the Secretary of the Interior, United States Government. The bond is in lieu of depositing cash to guarantee reclamation of exploration drill holes in the Arkose Mining Venture and surety was provided by an insurance company. The bond applies to 250 drill holes on a revolving basis. The Company and the Arkose Mining Venture have a 100% record of completing reclamation without recourse to security provided. |
|
d) | On May 1, 2009, the Company agreed to pay an estimated cost of $202,987, subsequently revised to $163,107, for the Nichols Ranch Power Line Extension Project. As at March 31, 2011, a $40,957 payment for engineering and design has been paid and recorded as an expense and $122,150 has been paid as a deposit which will be reclassified upon obtaining construction approval. |
|
e) | On May 19, 2010, the Company signed an office premises lease for a period of three years commencing September 1, 2010. Rent is approximately $52,122 (Cdn$50,604) per annum. |
|
f) | In December 2010, the Company provided a $1,700,000 cash security to support a bond in the amount of $6,800,000 to the State of Wyoming, Department of Environmental Quality or the Secretary of the Interior, United States Government. The bond is in lieu of depositing cash to guarantee mine reclamation. The bond applies to the first years operation of the Companys Nichols Ranch ISR Uranium Project. This amount together with other surety deposits of $319,721 have been classified as mineral property reclamation surety deposits. |
|
13. | Segment Disclosures |
|
The Company has two operating segments both involving the acquisition and exploitation of uranium and mineral resources. These operating segments consist of the Arkose Mining Venture (Arkose) and the Companys remaining operations. |
||
Factors used to identify the Companys reportable segments include the organizational structure of the Company and the financial information available for evaluation by the chief operating decision-maker in making decisions about how to allocate resources and assess performance. The Companys operating segments have been broken out based on similar economic and other qualitative criteria. The Company operates both reporting segments in one geographical area, the United States. |
||
The Chief Executive Officer is the Companys Chief Operating Decision Maker (CODM) as defined by ASC 280, Segment Reporting. The CODM allocates resources and assesses the performance of the Company based on the results of operations. |
F-11
Uranerz Energy Corporation |
(An Exploration Stage Company) |
Notes to the Consolidated Financial Statements |
March 31, 2011 |
(Expressed in US dollars) |
(Unaudited) |
13. | Segment Disclosures (continued) |
Financial statement information by operating segment is presented below: |
March 31, 2011 | December 31, 2010 | ||||||||||||||||||
Total | Uranerz | Arkose | Total | Uranerz | Arkose | ||||||||||||||
$ | $ | $ | $ | $ | $ | ||||||||||||||
Assets | 52,422,029 | 51,986,914 | 435,115 | 40,634,083 | 39,770,022 | 864,061 |
For the | For the | ||||||||||||||||||
Three Months Ended | Three Months Ended | ||||||||||||||||||
March 31, 2011 | March 31, 2010 | ||||||||||||||||||
Total | Uranerz | Arkose | Total | Uranerz | Arkose | ||||||||||||||
$ | $ | $ | $ | $ | $ | ||||||||||||||
Net loss | (5,182,671 | ) | (5,062,772 | ) | (119,899 | ) | (5,694,795 | ) | (5,579,742 | ) | (115,053 | ) | |||||||
Foreign exchange | (16,083 | ) | (16,083 | ) | | | | | |||||||||||
Interest income | 96,394 | 96,394 | | 15,506 | 15,506 | | |||||||||||||
Depreciation | (54,718 | ) | (54,718 | ) | | (46,371 | ) | (46,371 | ) | |
14. | Subsequent Event |
On April 7, 2011, the Company granted 884,500 stock options to directors, officers, employees and consultants to acquire 884,500 common shares at an exercise price of $3.21 per share expiring April 6, 2021. |
F-12
Item 2. Management's Discussion and Analysis of Financial Condition and Results of Operations
Forward-Looking Statements
This quarterly report contains "forward-looking-statements" within the meaning of the Private Securities Litigation Reform Act of 1995. Such forward-looking statements concern our anticipated results and developments in our operations in future periods, planned exploration and, if warranted, development of our properties, plans related to our business and other matters that may occur in the future. These statements relate to analyses and other information that are based on forecasts of future results, estimates of amounts not yet determinable and assumptions of management.
Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always, using words or phrases such as "expects" or "does not expect", "is expected", "anticipates" or "does not anticipate", "plans", "estimates" or "intends", or stating that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved) are not statements of historical fact and may be forward-looking statements. Forward-looking statements are subject to a variety of known and unknown risks, uncertainties and other factors which could cause actual events or results to differ from those expressed or implied by the forward-looking statements, including, without limitation:
This list is not exhaustive of the factors that may affect our forward-looking statements. Some of the important risks and uncertainties that could affect forward-looking statements are described further under the sections titled "Risk Factors and Uncertainties" contained in our annual report on Form 10-K for the year ended December 31, 2010 and filed with the Securities and Exchange Commission on March 15, 2011. Should one or more of these risks or uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those anticipated, believed, estimated or expected. We caution readers not to place undue reliance on any such forward-looking statements, which speak only as of the date made. We disclaim any obligation subsequently to revise any forward-looking statements to reflect events or circumstances after the date of such statements or to reflect the occurrence of anticipated or unanticipated events, except as required by law.
General
Uranerz Energy Corporation is a U.S.-based uranium company focused on achieving near-term commercial in-situ recovery (ISR) uranium production. ISR is a mining process that uses a leaching solution to extract uranium from underground ore bodies; it is the generally accepted extraction technology (41% of world production in 2010) used in the Powder River Basin area of Wyoming. The Company controls a large strategic land position in the Pumpkin Buttes Uranium Mining District of the central Powder River Basin of Wyoming, U.S.A. Two of these ISR projects are currently in the advanced permitting and licensing stage and a third is at an exploration stage.
The Uranerz management team has specialized expertise in the ISR uranium mining method, and a record of licensing, constructing, and operating ISR uranium projects. The Company has entered into long-term contracts for the sale of uranium to two of the largest nuclear utilities in the U.S., including Exelon. These two agreements do not individually represent a substantial portion of our targeted uranium production and our business is not substantially dependent on these agreements.
Our principal business office and our operations office are located at 1701 East E Street, PO Box 50850, Casper, Wyoming 82605-0850 and our phone number there is 307-265-8900. We also maintain an administrative and investor relations office located at Suite 1410 800 West Pender Street, Vancouver, British Columbia, Canada V6C 2V6, and our telephone number there is 604-689-1659.
We are principally focused on the exploration of our properties in the Powder River Basin area of Wyoming. We are exploring these properties with the objective of assessing their viability as commercial ISR uranium mining projects. We also own interests in properties in the Great Divide Basin area of Wyoming, and Texas. .
In 2007, we applied for mine operating permits on two of our properties in the Powder River Basin area of Wyoming, Nichols Ranch and Hank, that we feel have the potential, based on data in our possession, of being developed into commercial ISR uranium mines. These permits are in the advanced permitting and licensing stage and, if received, would allow us to develop our Nichols Ranch and Hank units toward production of uranium yellowcake concentrate, which can be sold directly to utilities for processing into fuel used in nuclear electrical generating facilities.
In March 2010, we commenced preparation of environmental permit and license applications for a third ISR uranium mining unit in the central Powder River Basin of Wyoming. This unit, Jane Dough, is adjacent to the area currently being licensed and will share its infrastructure. Jane Dough includes the Doughstick, South Doughstick and North Jane properties.
Our Powder River Basin properties include:
Our 100% owned properties are comprised of unpatented mineral lode claims, state leases and fee (private) mineral leases, summarized as follows:
Number of Claims/ | |||||||||
Property Composition | Ownership Interest (1) | Leases | Acreage | ||||||
Unpatented Lode Mining Claims | 100% | 877 | 17,540 | ||||||
State Leases | 100% | 7 | 6,480 | ||||||
Fee (private) Mineral Leases | 100% | 23 | 2,524 | ||||||
Total | 26,544 |
(1) Subject to various royalties.
Our 100% owned properties in the Powder River Basin include the following property units:
Property | No. Claims | Acreage | ||||
Doughstick | 22 | 440 | ||||
Collins Draw | 32 | 640 | ||||
North Rolling Pin | 54 | 1,080 | ||||
Hank | 66 | 1,320 | ||||
Nichols Ranch | 36 | 720 | ||||
Willow Creek | 11 | 220 | ||||
West North-Butte | 125 | 2,500 | ||||
East Nichols | 44 | 880 | ||||
North Nichols | 107 | 2,140 | ||||
Reno Creek | 13 | 260 | ||||
TOTAL | 510 | 10,200 |
The Arkose Mining Venture properties are comprised of unpatented lode mining claims, state leases and fee (private) mineral leases, summarized as follows:
Number of Claims/ | |||||||||
Property Composition | Ownership Interest (1) | Leases | Acreage | ||||||
Unpatented Lode Mining Claims | 81% | 2,857 | 46,763 | ||||||
State Leases | 81% | 3 | 2,080 | ||||||
Fee (private) Mineral Leases | 81% | 68 | 18,430 | ||||||
Total | 67,273 |
(1) Subject to various royalties.
Through a combination of claim staking, purchasing and leasing, we have also acquired interests in projects that lie within the Powder River Basin but outside of the project areas discussed above. These properties include the Verna Ann and Niles Ranch projects. These projects are located in sandstone basins of Tertiary age with known uranium mineralization. However, due to our focus on other projects, we have not yet initiated exploration work on the aforementioned projects.
Our plan of operations is to continue exploration and, if permitted, development of our Wyoming Powder River Basin properties. Our Wyoming Great Divide Basin and Texas properties are under strategic review. Information regarding the location of and access to our Wyoming properties, together with the history of operations, present condition and geology of each of our properties, is presented in Item 2 of our Annual Report on Form 10-K for the year ended December 31, 2010 under the heading Description of Properties, previously filed with the SEC on March 15, 2011.
As of March 31, 2011, we are proceeding to obtain operating permits on the Nichols Ranch, Hank and Jane Dough units in the Powder River Basin area of Wyoming that we feel have the potential, based on data in our possession, of being developed into commercial ISR uranium mines. Additional units may be added as we assess our geological data.
We plan to use the ISR mining process. In this process, a leaching agent, which contains an oxidant such as oxygen with sodium bicarbonate (commonly known as baking soda) and carbon dioxide, is added to the native groundwater and injected through wells into the ore body in a sandstone aquifer to dissolve the uranium. This solution is then pumped via other wells to the surface for processing into finished yellowcake product ready for sale to utilities requiring nuclear fuel for operations resulting in a cost-efficient and, relative to other common mining methods, a more environmentally friendly mining process.
The ISR mining process differs dramatically from conventional mining techniques in that ISR mining leaves the rock matrix in place. The ISR technique avoids the movement and milling of rock and ore as well as mill tailing waste associated with more traditional mining methods.
Our December 2007 applications for a Permit to Mine and a Source Material License for the Nichols Ranch ISR Uranium Project submitted to the Wyoming Department of Environmental Quality Land Quality Division (WDEQ) and the United States Nuclear Regulatory Commission (NRC) are proceeding as planned. The WDEQ permits have been received and the NRC application has progressed to a final stage. Concurrently we have substantially completed the detailed engineering and design of our production well fields and processing facility for the Nichols Ranch and Hank units. Approval of the final permit application should allow us to proceed with development of the commercial mining facilities and related infrastructure.
The mine plan for the Nichols Ranch ISR Uranium Project includes a central processing facility at our Nichols Ranch unit and a satellite ion exchange uranium concentrating facility at our Hank unit. The ultimate production level from these two units is planned to be in the range of 600,000 to 800,000 pounds per year (as U3O8). The central processing facility will have a licensed capacity of two million pounds per year of uranium (as U3O8) and it is intended that it will process uranium-bearing well field solutions from Nichols Ranch, as well as uranium-loaded resin transported from the Hank satellite facility, plus uranium-loaded resin from any additional satellite deposits that may be developed on our other Powder River Basin properties. The Jane Dough unit is compatible with this plan. We believe this centralized design enhances the economics of our potential additional satellite projects by maximizing production capacity while minimizing further capital expenditures on processing facilities.
In anticipation of receiving all the approvals necessary to begin construction in 2011, we have commenced a marketing program for conditional sales of uranium from our Nichols Ranch ISR Uranium Project. On July 23, 2009, we announced that we entered into a sales agreement with Exelon Generation Company, LLC for the sale of uranium over a five year period for defined pricing. On August 17, 2009 we announced our second contract for the sale of uranium to a U.S. utility also over five years, with a pricing structure that contains references to both spot and long-term prices and includes a floor and ceiling price. These two agreements do not individually represent a substantial portion of our targeted uranium production.
During the first quarter of 2011 we:
We started exploration activities in late April 2011, focusing on the northeast drilling targets and then we plan to work our way to the south. Will begin installing environmental monitor wells at Nichols Ranch and then production wells for the commercial well field, when approval of the mining permits is received.
Financial Position
The Company's overall financial position is disclosed in the Company's Annual Report on Form 10-K for the year ended December 31, 2010 filed with the Securities and Exchange Commission on March 15, 2011 and the unaudited consolidated Financial Statements at March 31, 2011 as provided herein under the section heading "Financial Statements" above.
Liquidity and Capital Resources
We are carrying out an exploration, environmental and mine design program with a budget of approximately $3,600,000 in 2011. This plan, plus general and administrative expenses of approximately $6,200,000, amounts to cash requirements of approximately $9,800,000 for the year ending December 31, 2011 as reported in Item. 2 of our Annual Report on Form 10-K for the year ended December 31, 2010 under the heading "Description of Properties", previously filed with the SEC. Mineral property acquisitions, dependent upon opportunities that may arise, and Nichols Ranch ISR Uranium Project capital costs will be additional expenditures. During the three months ended March 31, 2011, mineral property expenditures incurred were $289,738.
At March 31, 2011 we had cash and short term securities of $47,369,035 and working capital of $46,607,109, as compared to cash and short term securities of $36,437,370 and working capital of $36,526,165 as at December 31, 2010. Our cash is invested in bank guaranteed savings accounts which, although available on demand, yield favorable rates of return.
Net cash used in operating activities was $2,091,839 for the three months ended March 31, 2011, compared to $2,598,913 for the corresponding period in 2010. The decrease in net cash used in operations of $507,074 resulted primarily from an increase in cash expenditures for general and administrative expenses of $991,721 and a decrease in mineral property expenditures of $896,803 over 2010 due to reduced acquisitions of data. Net cash used to purchase property and equipment was $404,899 for the three months ended March 31, 2011, compared to $52,666 used in the corresponding period in 2010, reflecting our expanding operations.
Net cash provided by financing activities amounted to $13,428,403 for the three months ended March 31, 2011, from proceeds of issuance of common stock on the exercise of options and warrants, compared to $29,050 provided in the corresponding period in 2010.
During the twelve-month period following the date of this quarterly report, we anticipate that we will not generate any revenue. Our exploration plans will be continually evaluated and modified as exploration and environmental results become available. General and administrative expenses, planning and environmental expenses are incurred throughout the year; most of our exploration expenditures are incurred during the nine-month period of March through November. Modifications to our plans will be based on many factors including results of exploration, assessment of data, weather conditions, exploration costs, the price of uranium and available capital. Further, the extent of exploration programs that we undertake will be dependent upon the amount of financing available to us.
To date, our primary source of funds has been equity investments, and this trend is expected to continue together with production related financing when our mine development permitting is complete. We believe we have sufficient cash to continue our exploration and planning and to meet on-going operating expenses for the next twelve months, and beyond, as we scale our operations to the resources we have available. We anticipate that any additional funding may be in the form of equity financing from the sale of our common stock and the exercise of share purchase options or debt, depending on capital markets. In this connection, we are proposing to increase the options available in our stock option plan from 10,000,000 to 30,000,000 and increase our authorized common shares from 200,000,000 to 750,000,000.
Our current short term investments have not been devalued by the current stock market disruptions as these investments are primarily in low risk bearer deposit notes issued and guaranteed by Canadian Chartered Banks. Rates of return, however, are at historic lows. At the end of the investment period of these securities we plan on reinvesting the securities in similar short term instruments. Management and the board of directors periodically meet to review the status of these investments and determine investment strategies, taking into account current market conditions and the short and long term capital needs of the Company.
Results of Operations
Three-month period ended March 31, 2011 compared to three-month period ended March 31, 2010
Revenue and Operating Expenses
We have not earned any revenues to date and we anticipate that we will not generate any revenues during the twelve-month period following the date of this quarterly report.
We incurred total operating expenses of approximately $5,357,104 for the three-month period ended March 31, 2011, as compared to $5,783,742 for the corresponding period in 2010. The decrease of operating expenses in the amount of $426,638 was primarily attributable to a $447,563 increase in general and administrative expenses and a $896,803 decrease in mineral property expenditures due to a $600,000 reduction in acquired geological data in 2011 as compared to 2010.
We had no significant financing expense for the three-month periods ended March 31, 2011 and 2010. We earned $96,394 of interest income for the three-month period ended March 31, 2011 as compared to $15,506 for the corresponding period in 2010. This income resulted from short term investments which are realizing low returns.
Net loss for the three-month period ended March 31, 2011 was approximately $5,182,672, as compared to approximately $5,694,795 for the corresponding period in 2010.
Off-Balance Sheet Arrangements
We have no significant off-balance sheet arrangements that have or are reasonably likely to have a current or future effect on our financial condition, changes in financial condition, revenues or expenses, results of operations, liquidity, capital expenditures or capital resources that are material to stockholders except as disclosed in the unaudited Financial Statements at March 31, 2011. The Company has had no material changes to its off-balance sheet arrangements as disclosed in the Company's Annual Report on Form 10-K for the year ended December 31, 2010 filed with the Securities and Exchange Commission on March 15, 2011 and the unaudited Financial Statements at March 31, 2011 as provided herein under the section heading "Financial Statements" above.
Critical Accounting Policies
The preparation of financial statements in accordance with U.S. generally accepted accounting principles requires us to make estimates and assumptions that affect the reported amounts of assets and liabilities at the date of the financial statements and the reported amounts of net revenue and expenses in the reporting period. We regularly evaluate our estimates and assumptions related to the useful life and recoverability of long-lived assets, stock-based compensation and deferred income tax asset valuation allowances. We base our estimates and assumptions on current facts, historical experience and various other factors that we believe to be reasonable under the circumstances, the results of which form the basis for making judgments about the carrying values of assets and liabilities and the accrual of costs and expenses that are not readily apparent from other sources. The actual results experienced by us may differ materially and adversely from our estimates. To the extent there are material differences between our estimates and the actual results, our future results of operations will be affected.
We believe the following critical accounting policies require us to make significant judgments and estimates in the preparation of our consolidated financial statements.
Mineral Property Costs
The Company is primarily engaged in the acquisition, exploration and development of mineral properties. Mineral property acquisition costs are capitalized in accordance with EITF 04-2 "Whether Mineral Rights Are Tangible or Intangible Assets" when management has determined that probable future benefits consisting of a contribution to future cash inflows have been identified and adequate financial resources are available or are expected to be available as required to meet the terms of property acquisition and budgeted exploration and development expenditures. Mineral property acquisition costs are expensed as incurred if the criteria for capitalization are not met. In the event that a mineral property is acquired through the issuance of the Company's shares, the mineral property will be recorded at the fair value of the respective property or the fair value of common shares, whichever is more readily determinable.
When mineral properties are acquired under option agreements with future acquisition payments to be made at the sole discretion of the Company, those future payments, whether in cash or shares, are recorded only when the Company has made or is obliged to make the payment or issue the shares. When it has been determined that a mineral property can be economically developed as a result of establishing proven and probable reserves and feasibility, the costs incurred to develop such property are capitalized.
Contractual Obligations
The Company has had no material changes to its contractual obligations as disclosed in the Company's Annual Report on Form 10-K filed with the Securities and Exchange Commission on March 15, 2011 and the unaudited Financial Statements at March 31, 2011 as provided herein under the section heading "Financial Statements" above.
Item 3. Quantitative and Qualitative Disclosures About Market Risk
Our operations are not yet exposed to risks associated with commodity prices, interest rates and credit. Commodity price risk is defined as the potential loss that we may incur as a result of changes in the fair market value of uranium. Interest rate risk results from our debt and equity instruments that we issue to provide financing and liquidity for our business. Credit risk would arise from the extension of credit throughout all aspects of our business but is not yet significant. Industry-wide risks can, however, affect our general ability to finance exploration, and development of exploitable resources; such effects are not predictable or quantifiable.
Item 4. Controls and Procedures
Disclosure Controls and Procedures
At the end of the period covered by this report, an evaluation was carried out under the supervision of and with the participation of the Companys management, including its Chief Executive Officer (CEO), Glenn Catchpole, and Chief Financial Officer (CFO), Benjamin Leboe, of the effectiveness of the design and operations of the Companys disclosure controls and procedures (as defined in Rule 13a 15(e) and Rule 15d 15(e) under the Exchange Act). Based on that evaluation, the CEO and the CFO have concluded that as of the end of the period covered by this report, the Companys disclosure controls and procedures were adequately designed and effective in ensuring that: (i) information required to be disclosed by the Company in reports that it files or submits to the Securities and Exchange Commission under the Exchange Act is recorded, processed, summarized and reported within the time periods specified in applicable rules and forms; and (ii) material information required to be disclosed in our reports filed under the Exchange Act is accumulated and communicated to our management, including our CEO and CFO, as appropriate, to allow for accurate and timely decisions regarding required disclosure.
Disclosure controls and procedures are controls and other procedures that are designed to ensure that information required to be disclosed in our reports filed or submitted under the Exchange Act is recorded, processed, summarized and reported, within the time periods specified in the Securities and Exchange Commission's rules and forms. Disclosure controls and procedures include, without limitation, controls and procedures designed to ensure that information required to be disclosed in our reports filed under the Exchange Act is accumulated and communicated to management, including our CEO and CFO, to allow timely decisions regarding required disclosure.
Changes in Internal Control over Financial Reporting
During our most recently completed fiscal quarter ended March 31, 2011, there were no changes in our internal control over financial reporting that have materially affected, or are reasonably likely to affect, our internal control over financial reporting.
The term internal control over financial reporting is defined as a process designed by, or under the supervision of, the registrant's principal executive and principal financial officers, or persons performing similar functions, and effected by the registrant's board of directors, management and other personnel, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles and includes those policies and procedures that:
(a) |
Pertain to the maintenance of records that in reasonable detail accurately and fairly reflect the transactions and dispositions of the assets of the registrant; |
(b) |
Provide reasonable assurance that transactions are recorded as necessary to permit preparation of financial statements in accordance with generally accepted accounting principles, and that receipts and expenditures of the registrant are being made only in accordance with authorizations of management and directors of the registrant; and |
(c) |
Provide reasonable assurance regarding prevention or timely detection of unauthorized acquisition, use or disposition of the registrant's assets that could have a material effect on the financial statements. |
PART II - OTHER INFORMATION
Item 1. Legal Proceedings.
We currently are not a party to any material legal proceedings and, to our knowledge, no such proceedings are threatened or contemplated.
Item 1A. Risk Factors
There have been no material changes from the risk factors as previously disclosed in our Annual Report on Form 10-K for the year ended December 31, 2010 filed with the Securities and Exchange Commission on March 15, 2011.
Item 2. Unregistered Sales of Equity Securities and Use of Proceeds
During the quarter ended March 31, 2011, no unregistered securities were sold.
Item 3. Defaults upon Senior Securities
None.
Item 4. (RESERVED & REMOVED)
Item 5. Other Information
Mine Safety Disclosure
Pursuant to Section 1503(a) of the Dodd-Frank Wall Street Reform and Consumer Protection Act of 2010 (the Dodd-Frank Act), issuers that are operators, or that have a subsidiary that is an operator, of a coal or other mine in the United States are required to disclose in their periodic reports filed with the SEC information regarding specified health and safety violations, orders and citations, related assessments and legal actions, and mining-related fatalities. During its fiscal quarter ended March 31, 2011, the Company had no such specified health and safety violations, orders or citations, related assessments or legal actions, mining-related fatalities, or similar events in relation to the Companys United States operations requiring disclosure pursuant to Section 1503(a) of the Dodd-Frank Act.
Item 6. Exhibits
The following exhibits are attached to this Quarterly Report on Form 10-Q:
(1) |
Previously filed as an exhibit to the Registrants Form SB-2 filed March 15, 2002 |
(2) |
Previously filed as an exhibit to the Registrants Annual Report on Form 10-KSB filed April 14, 2006 |
(3) |
Previously filed as an exhibit to the Registrants Quarterly Report on Form 10-Q filed August 11, 2008 |
(4) |
Previously filed as an exhibit to the Registrants Form S-3 filed July 9, 2009 |
(5) |
Previously filed as an exhibit to the Registrants Form S-3 filed July 9, 2009 |
(6) |
Previously filed as an exhibit to the Registrants Form 8-K, filed October 22, 2009 |
(7) |
Previously filed as an exhibit to the Registrants Form 8-K, filed October 27, 2009 |
(8) |
Previously filed as an exhibit to the Registrants Form 8-K, filed August 26, 2010 |
SIGNATURES
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned thereunto duly authorized.
URANERZ ENERGY CORPORATION
By: /s/ Benjamin Leboe | By: /s/ Glenn Catchpole |
Benjamin Leboe, Senior Vice President, Finance and | Glenn Catchpole, President and Principal Executive |
Chief Financial Officer | Officer, Director |
Date: May 10, 2011 | Date: May 10, 2011 |